Showing posts with label Wind. Show all posts
Showing posts with label Wind. Show all posts

Monday, April 18, 2016

Wind comes from the Sun, so cool.

IMG 1530 Sun walking on Water 

See the Sun walking on water.  I believe this is what the real meaning of walking on water comes from.  The shape this forms is found in ancient symbolism.

The Sun creates heat on a planet that is lumpier and bumpier than my Sunday gravy, Earth.   It is the mountains and valleys which creates the differing temperatures that then make wind.   None of it possible with out the sun.  The sun is the heat factor that causes the expansion.  The heat is sent via radiation from the sun and so wind has a magnetic beginning.

Without the sun being what it is it would be impossible produce solar, wind, or water energy.

Our sun creates energy here on Earth and without the sun every thing would be pointless.  We would not exist for starters Without the Moon there would not be ocean tides.   The Moon is moving away from the Earth. In a few billion years it's orbit will have expanded about 40%,  it is said this will have severe effects on our oceans and tides.


Images @ Eminpee Fotography

Saturday, August 17, 2013

WIND FARMS AUSTRALIA.

IMG 9813 AGL FRACKING FARM
AGL SIGNS at Gloucester NSW
 The Macarthur Wind Farm is a wind farm under construction in Victoria, Australia. The project is located in Macarthur, Victoria on a 5,500 ha site and it has been permitted to generate up to 420 MW. 

The wind farm will comprise 140 3 MW Vestas V112 wind turbines manufactured in Denmark. It is expected to be the largest wind farm in the Southern Hemisphere, generating enough power for 220,000 homes and abating 1.7 million tons of greenhouse gases annually.

The project is estimated to cost A$1 billion and is due for completion in 2013. It is constructed by Vestas and Leighton Contractors. The first completed turbines have been connected to the grid in September 2012.

The project was developed by a joint venture formed by AGL Energy and Meridian Energy. In 2013, Meridian sold its share to Malakoff Corporation Berhad.

What I find difficult to understand is why there is the need for a Malaysian Electricity Company to be owning any of this.  Why is our Wind power owned by overseas investment.  Surely there are companies in Australia who would like to invest in this type of energy.

The infrastructure build by Leightons and Vestas is in my dodgy brothers.  It appears to be this because its another contract for mates who appease the rich energy companies.   These companies, and there are hundreds of these, have already done so much damage to this country.  Can they be trusted to do the right thing with the turbines on the wind farms.

I highly doubt this.  I have seen the damage to country first hand by what they term as best practice and if this is what is termed best practice you would be real glad they are not Airline pilots because if they were we would all be dead  ten flights ago.

I highly doubt that any of this is on the up and up.   The feed in tarrifs on solar power alone has been halved to 20 cents from 40 cents.   The Coal fired and Gas fired stations are getting some sort of weirdo preferences in parliament and those ordinary Australians who invested in Solar roof panels to feed in are now being shafted.  It it a surprise this has happened, no not really.   This is how these greedy conglomerates work.   A scheme that killed people is now a white elephant because the government is scared of its own past decisions.

We, as the people of Australia, will not sit down for this any longer. We will just keep fighting to see a fairer Australia for our children and Grand Children to live in.  If we let this continue unabated with Coal Seam Gas mining to fire power stations we will have a dead Australia.  Our entire land will be with out water and we will resemble a moon scape.  The amount of saline water falling onto land is criminal.

Macarthur Wind Farm Update from AGL's website  

On Site

Commencement of Operation: The wind farm was connected to the electricity grid in late September and began generating electricity from the first wind turbines on 30 September 2012.
The 33kV transmission line is now having final stringing of the conductors which will allow connection to the northernmost 70 turbines in the wind farm.
127 of the total number of 140 wind turbines are now erected. These turbines will be progressively commissioned as power becomes available to various parts of the wind farm. The wind farm is expected to become fully operational by early 2013.

Roads Update

Road Users Alert: Road users are asked to take special care when travelling in the vicinity of the wind farm. Wind turbines have commenced operation and may provide a distraction to road users with the potential to cause accidents. Please maintain normal safe driving practices and should you wish to observe any wind turbines in operation please pull over to a safe location on the roadside.
Speed limits in the vicinity of the wind farm have been reduced for the duration of the project.
All deliveries of wind turbine components are now complete.

Community Focus

AGL, Meridian Energy, Vestas and Leighton Contractors are all contributing to various community projects, including upgrading sporting facilities, augmenting health care equipment, improved child care facilities and development of public spaces. The communities of Macarthur and Hawkesdale will see the benefits of these projects in the coming months.

Tuesday, January 29, 2013

The Rain Rains On and now its Windy Hill!

The wind started and I am quite pleased the tree in the front yard has already fallen because it would not have stood up to this onslaught of weather here on the hill.

IMG 8473 Urunga in Deluge
Lights on in the day time in Urunga today.
My friends at Glenugie are holding fast and trying to stay dry the best they can.  The drill rig is holding fast inside of the compound, like a yellow bird in a cage.  The longer this stays there the better as well.  Every single day it now stays put once again will cost it thousands of dollars in lost time and production.  In turn this effects the share price.  The share holders are going to get edgy in the end.  This is all we can do to try to save the planet from this type of mining madness.
Solar can hold a base load 24/7 now so we need to adopt this model as soon as possible in my life time would be bloody good.

Images @ Melonpopzdropz Flickr